LyteMods, Dwelling Reimagined
Altadena, CA: Eaton Fire Rebuild

480 W Palm St

Flagship Fire Rebuild, In Progress

Our flagship Eaton Fire rebuild in Altadena. Contracted and in progress, a full home reconstruction using LyteMods non-combustible light-gauge steel, managed end to end by the TESH Group. Covered by KTLA Channel 5.

From the Vertex BD digital twin to steel standing on site, 39 views of the build.

Explore the 3D Model

About this project

The project that proves the model.

480 W Palm St is our first full fire rebuild contract in the Altadena burn zone, the project that moves our fire rebuild capability from pitch to proof. The home will be built in non-combustible light-gauge steel from our factory, permitted through our managed process, and installed by a Certified Installer.

KTLA Channel 5 has covered this project as part of their Eaton Fire rebuild reporting. Video link coming when available.

  • Non-combustible light-gauge steel structure
  • Factory-built, then assembled on site
  • Permits managed by the TESH Group design team
  • Fixed-price contract: Permit Approval or Money Back
  • End-to-end managed by one team
Location
Altadena, CA (Eaton Fire zone)
Square footage
2,789 sq ft
Bedrooms / Baths
4 Bed / 4 Bath
Method
Panelized LGS, hybrid modular assembly
Status
In progress
Press
KTLA Channel 5 (link TBD)

Project timeline

Rebuild milestones.

Contract signed

Complete

Site assessment & design

Complete

Permit submittal

In progress

Factory production

Upcoming

Delivery & installation

Upcoming

Finish & certificate of occupancy

Upcoming

Milestone dates and homeowner quote to be added with owner's confirmation and homeowner consent.

Homeowner story

Homeowner quote and story, pending homeowner participation and consent.

Your Altadena rebuild could be next.

We offer a free site and insurance-scope assessment for fire-affected homeowners in Altadena and Pacific Palisades. No obligation.