From first call to a finished home.

LyteMods delivers a complete, move-in-ready home, not just a frame. One integrated team carries the whole path: design, permits, factory build, site assembly, and every finish through to your keys.

  • Factory-built
  • Fully managed
  • Move-in ready

The journey at a glance

  1. 01

    Discover

    With you

  2. 02

    Design & Configure

    With you

  3. 03

    Permits

    With your city

  4. 04

    Factory Build

    In our factory

  5. 05

    Deliver & Set

    On your site

  6. 06

    Complete On-Site

    On your site

  7. 07

    Keys

    Move-in day

The full journey, phase by phase.

You make a handful of easy decisions. We carry everything else, all the way to a finished home.

  1. 01

    Discover

    With you

    Free property evaluation, site review, and zoning check. We identify which models fit your lot and your goals.

    What you do

    Have a 30-minute call with our team.

    What we do

    Evaluate feasibility and recommend models.

  2. 02

    Design & Configure

    With you

    Choose your model, then select finishes, upgrades, and layout options. Lock in your configuration.

    What you do

    Make selections from our options menu.

    What we do

    Finalize drawings and engineering, and prepare the permit package.

  3. 03

    Permits

    With your city

    We manage permitting end to end: submittals, plan check, corrections, and ready-to-issue. This is the phase that varies most, since it moves at your city's pace.

    What you do

    Sign documents when needed.

    What we do

    Run the whole process with your jurisdiction.

  4. 04

    Factory Build

    In our factory

    Your home is fabricated indoors, light-gauge steel framing and precision panelized systems, built to spec while site work runs in parallel.

    What you do

    Follow along with progress updates.

    What we do

    Fabricate, quality-check, and prepare for delivery.

  5. 05

    Deliver & Set

    On your site

    Foundation and site prep, delivery, and erection. We set and secure the steel structure on your foundation.

    What you do

    Watch your home take shape.

    What we do

    Deliver, crane-set, and weather-tight the structure.

  6. 06

    Complete On-Site

    On your site

    We turn the structure into a finished home: mechanical, electrical, and plumbing; insulation and drywall; flooring, cabinetry, fixtures, and finishes.

    What you do

    Confirm any final finish details.

    What we do

    MEP, drywall, cabinetry, and finishes, through to move-in ready.

  7. 07

    Keys

    Move-in day

    Final inspection and certificate of occupancy. Your complete LyteMods home is ready.

    What you do

    Move in.

    What we do

    Final walk-through, then hand over the keys.

Aerial view of a completed light-gauge steel floor plan framed on the foundation
The steel floor plan from above, every wall engineered and cut in the factory, then assembled and finished on your foundation.

We don't quote fixed week counts here, because the schedule depends on your city's permitting and your site. Once we know your lot and jurisdiction, we'll give you a real timeline for your project. Fire rebuild, custom, and multifamily projects follow the same path with their own schedules.